Charging system with prepared charging points

“Den gamle Margarinfabrikken Sameie” (The Old Margarine Factory Housing Cooperative) at Tøyen, Oslo, has installed EV charging infrastructure at all parking spaces within their garage. Five of the spaces are equipped with DEFA Power S units. The remaining spaces are equipped with the Power Ready S wall bracket, including all necessary preparation for simple future upgrade – circuit breaker, cabling, and power supply.

;eierifabrikken

Thanks to the integrated MCB (Circuit breaker) in the wall bracket, installation is smooth and efficient. The wall bracket is delivered with a protective cover,
keeping the charge point protected. All the resident needs to do is order DEFA Power Up charging unit from the installer and have it connected.

About the project

  • Site owner: Den gamle Margarinfabrikken Sameie, Oslo
  • Installer: Torshov Elektro
  • Resident parking in garage:
    • 5 DEFA Power S units mounted on the wall
    • 14 prepared charging points with Power Ready S
  • Cabeling: Daisy chain connection

Products used in the project:

DEFA Power 5xBestInTest

DEFA Power Up m/6 meter

is also available with a 4-meter charging cable and including a docking for easy cable handling.

To purchase products, check your region for DEFA partners and resellers.

Cabling used: Cabling: Daisy chain connection

Daisy Chain connection DEFA Power and Power Ready S

Installer insights

Easy to prepare charge points for future expansion

DEFA Power installeres i Gamle Margarinfabrikken

DEFA Power installed at Gamle Margarinfabrikken.
Torshov Elektro was responsible for the installation:
“What’s really great about DEFA Power S is that the wall bracket has an integrated breaker, which eliminates a lot of preliminary work. One cable in, connect it, and it’s ready. The installation job is very smooth.”

“The wall bracket solution is ideal when you want to install a charger later, as everything is prepared in advance. You simply order a charging unit, attach it, lock it in place, spend 2–3 minutes in the app, and it’s up and running. The cost for the customer is also lower since there’s significantly less work required per charger afterwards,” says Robert at Torshov Elektro.